Supply Chain News / Ocean / Ports

Heavy-Lift Crane Arrives in Charleston Harbor

The heavy-lift crane is a fully-mobile barge crane that will service all SCPA terminals.

March 10, 2014
Trans

The Ocean Ranger, Charleston Harbor's newest heavy-lift crane, made its Lowcountry debut unloading a 308-ton generator onto a barge at Columbus Street Terminal.

The Ocean Ranger has a 500-ton lift capacity and can achieve a lift rating of up to 740 tons for heavier cargo. As a fully mobile barge crane, the Ocean Ranger is designed primarily for heavy project cargo lifts to and from breakbulk vessels but can also lift cargo on barges, railcars, trucks and container vessels.

The S.C. Ports Authority invested in the construction of the Ocean Ranger to ensure priority access and dedicated service over the life of the crane for Port of Charleston terminals. It is owned and operated by Charleston Heavy Lift Inc.

"The Ocean Ranger is the newest asset in the Charleston Harbor," said SCPA President and CEO Jim Newsome. "It brings a new capability to meet the needs of our customers who transport their breakbulk and non-container project cargo across our docks."

Ocean Ranger boasts a LOA of 200 feet and a 162-foot long lifting boom. Certified by the American Bureau of Shipping and offshore-capable, the crane has the functionality to be used for salvage and recovery projects outside of the Charleston Harbor.

"We look forward to supporting breakbulk cargo operations and offering ocean carriers the benefit of our expanded services," said Charleston Heavy Lift General Manager Bos Smith.

The crane barge was locally manufactured by Metal Trades Inc. at their shipyard in Yonges Island. Ocean Ranger will be docked on the Cooper River near Veterans Terminal.   

You must login or register in order to post a comment.

Multimedia

Videos

Image Galleries

Five Wearable Manufacturing Technologies of the Future

Video applications, Employee Monitoring, Field service, Plant monitoring, Improving employee safety

Podcasts

Assurance of Supply: A Top Concern for Manufacturers

Every manufacturer has an assurance of supply problem to some extent due to the complexity of global sourcing. For years, manufacturers were blessed with high margins but margins have grown paper thin. You can’t fill up your distribution centers with excess inventory – not only is there a cost factor but the pace of business and consumer buying trends causes goods to quickly turn obsolete. Assurance of supply provides the speed and agility that is essential to being able to compete in today’s market.

 

Speaker info: Diane Palmquist, VP Manufacturing Industry Solutions

                                         

More Podcasts

World Trade 100 Magazine

wt october 2014

2014 October

Check out the October 2014 edition of World Trade WT100, featuring our cover story: Logistics Drives Site Selection, plus much more!

Table Of Contents Subscribe

Transportation Capacity

As peak season has gotten underway, what is your experience with transportation capacity?
View Results Poll Archive

WT100 STORE

world-class-warehousing.gif
World-Class Warehousing and Material Handling, 1st Edition

Filled with proven operational solutions, it will guide managers as they develop a warehouse master plan, one designed to minimize the effects of supply chain inefficiencies as it improves logistics accuracy and inventory management - and reduces overall warehousing expense.

More Products

Clear Seas Research

Clear Seas ResearchWith access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

STAY CONNECTED

Use our interactive maps to locate service providers across North America.Interactive Map

Logistics Development Partners 

IWLA Members