The Meadow Lake Wind Farm-a 26,000-acre “clean energy” project-could eventually contain 600 turbines supplying power to more than 250,000 homes.
On June 1, the port received the first shipment of generators and hubs built by Denmark-based Vestas Wind Systems. Later that month, 94 blades measuring 132-feet long by 10-feet high and 6-feet wide were unloaded at the port, along with more generators and hubs.


More




